Your general ledger becomes a ranked list of cost projects — each one sized, owned and traceable.
What It Is
We start from your complete general ledger — not a sample — and build categories named the way your business actually buys, each carrying its annual cost, its vendors and the dollars in play.
It’s a pipeline, not a report. Every category ships as its own project file with an owner, a target and a dollar figure, every number traces back to a source GL line, and the analysis re-runs itself every month after we leave.
Why You Need It
Cost comes out when reductions are a scheduled list that never empties.
- Defensible base — start from the complete GL, so you can defend the whole addressable spend.
- Sized to act — categories small enough that someone will actually own and move them.
- It sticks — the rule set stays with you; the analysis reruns itself every month.
How It Makes Your Job Better
- A category structure built from your ledger, with the dollars ranked.
- A project file per category — owner, target, dollar figure, traceable to the GL.
- A monthly analysis your team runs after we go.
What It Produced
On one completed engagement — an anonymized $25M manufacturer — the pipeline analyzed $24.8M of general ledger, resolved 571 vendors into 37 categories, and identified $1.24M in annual impact.


